Solar Net Metering in Delhi
Net metering records an approved solar connection’s electricity imports and exports. The utility’s current rules determine feasibility, meter arrangements and bill settlement. Identify the actual connection before estimating benefits or applying.
Site-specific assessment · Written scope · Eligibility checks

Start with the supplier on your bill
Keep a recent bill showing the electricity distribution company, consumer number, category, phase and sanctioned load. A broad locality name is not enough to establish the correct application route.
Delhi and neighbouring NCR properties can fall under different regulators and utilities. Use the rules for the physical connection address. Do not submit a Delhi process checklist unchanged for a property in another state.
A practical connection workflow
- Confirm the applicable utility route and current document checklist.
- Check proposed capacity and technical feasibility against the actual connection.
- Agree the system design and responsibility for paperwork.
- Follow the permitted installation and inspection sequence.
- Complete metering and authorised energisation, then verify monitoring and the first relevant bill.
The exact sequence and conditions come from the utility and scheme workflow. Do not assume that an inverter purchase authorises export.
Understand imports, exports and remaining charges
Energy used in the building during solar production can reduce grid imports. Surplus may be exported under the approved arrangement. Billing treatment, settlement periods and remaining charges must be checked under the current rules.
Net metering is not a battery. An ordinary grid-tied system still shuts down during a grid outage. If continuity matters, request a separate compatible backup design.
Shared roofs and alternative metering arrangements
Where roof access or connection ownership is shared, review permissions and any eligible group or virtual metering option with the utility. These arrangements have their own requirements and are not interchangeable with an individual rooftop application.
Before equipment procurement, confirm who owns the system, which connections receive the energy allocation and who is responsible for operation, maintenance and access.
Use current official requirements
Refer to the DERC regulation directory for current regulations and amendments, and the Delhi consumer installation guidance for the general process.
These sources describe the framework; the utility confirms the requirements of your application. ARISE documentation assistance does not guarantee feasibility, approval, meter installation dates or subsidy.
Your next step
Tell us about your property or product requirement
Share the location and scope so the team can confirm availability and prepare the next steps. No fixed price, approval or installation date is promised by submitting this form.
Related solar resources
Clear answers
Frequently asked questions
What is net metering?
Net metering records electricity imported from the grid and electricity exported by an approved renewable-energy system. Credits and settlement follow applicable rules.
Who approves a net-metering connection?
Your electricity distribution company handles its applicable application, feasibility, inspection and metering process under the relevant regulatory framework.
How can I identify my electricity distribution company?
Check the supplier name and consumer details on your latest electricity bill. Do not infer the supplier only from a locality name.
Can a solar inverter export before approval?
Do not energise or export outside the approved connection process. Follow the utility's requirements and the qualified installer's commissioning instructions.
Is net metering the same as battery backup?
No. Metering concerns grid imports and exports; battery backup stores energy and supplies designated circuits through a compatible system.
Is approval automatic for every roof?
No. Connection capacity, technical feasibility, documentation, safety and the applicable rules must be assessed.
How does sanctioned load affect an application?
It is an input to the utility's assessment. Any capacity or connection changes must follow current rules rather than an assumed universal limit.
Does exported electricity always have the retail value?
No. Export credits and settlement depend on the approved billing arrangement and current regulations. Confirm the treatment before estimating savings.
What is group or virtual net metering?
These are distinct metering arrangements for eligible connections. Availability, allocation and conditions must be checked against current DERC and utility requirements.
Do all Delhi NCR properties follow Delhi rules?
No. Properties outside Delhi may have different utilities, regulators and state processes. Confirm rules for the actual connection address.
What should I prepare before asking for assistance?
Provide the latest bill, connection category, sanctioned load, proposed capacity and roof details. Use the utility's current document checklist.
Where can I check the latest Delhi requirements?
Consult DERC, the Delhi Solar Portal and your electricity distribution company. Requirements and application procedures can change.