Skip to main content
Residential rooftop on-grid solar system installed on a home

ARISE Solar plans and installs residential rooftop solar in Delhi. A site survey checks usable roof area, shading and electricity consumption before the team proposes a system size. Share recent bills and any backup needs to compare on-grid, hybrid or off-grid options and request an itemised quotation.

  • 1 KW to 10 KW rooftop solar systems
  • On-grid, off-grid and hybrid options available
  • Assistance with PM Surya Ghar related documentation, subject to eligibility
  • Professional installation and after-sales support

Prepare a useful rooftop assessment

Share consumption in kWh from recent bills, roof access and ownership details, and daytime or backup requirements. Confirm the actual utility and connection details before selecting capacity. A 3kW, 5kW or 10kW label is a starting point, not a site approval.

Ask for a layout, exact equipment models and an itemised installation scope. Potential assistance and metering depend on official checks; avoid treating them as guaranteed savings.

Discuss your requirement

A home solar decision starts with three questions

How much electricity do you use?

Review several bills in kWh, including seasonal changes. Identify daytime loads and new appliances you expect to add. A bill in rupees includes tariff effects and charges; it is not a direct measure of the solar capacity required.

What can the roof support?

Check shading, roof rights, access and structural suitability. A flat with access to a shared terrace still needs the necessary permissions. Keep water tanks, drainage and service paths accessible.

Do you need backup?

Separate daytime generation from outage protection. For backup, list the essential circuits and required operating time. A battery system adds equipment, protection and maintenance requirements.

Compare the home system types

Final suitability depends on the property assessment and connection rules.
SystemMain purposeImportant check
On-gridDaytime generation with an approved grid connectionStops during a conventional grid outage
HybridSolar with compatible storage and grid supportBackup loads and battery energy must be designed
Off-gridSupply independently from the utility gridDaily energy demand and low-sun reserve are essential inputs

What to retain after installation

Ask for the final equipment schedule, warranties, serial numbers, operating instructions and relevant commissioning records. Confirm how monitoring access is handed over and whom to contact for a fault.

Utility approval and subsidy documentation should be retained separately from the equipment invoice. Review the first relevant utility bill against the approved metering arrangement rather than expecting every charge to disappear.

Compare quotation components · Explore capacity assumptions · Understand net metering

Clear answers

Frequently asked questions

What is rooftop solar installation?

Rooftop solar installation places photovoltaic modules on a suitable roof and connects them through an inverter and protection equipment to the building's electrical system.

How is the right solar capacity chosen?

Use electricity consumption in kWh, daytime demand, sanctioned load, roof conditions and backup needs. A bill amount alone is not enough to finalise capacity.

What should I share before a site assessment?

Share recent electricity bills, property location, roof photographs, roof access details and whether you own or have permission to use the roof.

Can solar be installed on a shared roof?

Shared roofs require the necessary ownership or society permissions. The electricity connection and applicable metering arrangement must also be checked.

Will an on-grid system work during a power cut?

A conventional grid-tied inverter shuts down during a grid outage for safety. Backup requires an appropriately designed storage and isolation arrangement.

How much roof space is needed?

Required space depends on module dimensions, shading, tilt, access paths and equipment clearances. A layout survey is needed before confirming capacity.

What affects the installation quotation?

Module and inverter selection, structure design, cable routes, protection equipment, roof access, civil work and approval requirements affect the quotation.

Is a solar subsidy guaranteed?

No. Eligibility, equipment compliance and approval depend on the applicable government scheme and electricity distribution company process.

What does net metering do?

Net metering records electricity imported from and exported to the grid. Billing treatment follows the applicable utility rules and approved connection arrangement.

How long does installation take?

Timing depends on design, materials, site readiness and external approvals. Request a project-specific schedule rather than relying on a fixed promise.

What maintenance does rooftop solar need?

Modules need cleaning appropriate to site conditions, while qualified technicians should inspect electrical connections, earthing, protection equipment and monitoring alerts.

How do I request an installation quote?

Contact ARISE Solar with your location, electricity bills and property details. Confirm service availability and the scope of the proposed site assessment.