An on-grid solar plant connects directly to the utility electricity grid and works alongside your existing power connection. Solar power generated during the day is used first, reducing dependence on grid electricity, with net metering allowing surplus units to be exported subject to your utility's regulations.
- No battery required, lower system cost
- Net metering support
- Suitable for areas with stable grid supply
- Site survey and documentation assistance
Note: An on-grid system does not provide power backup during a grid outage unless paired with battery storage.
Confirm the connection before planning export
Check the actual utility, sanctioned load and consumer category on the electricity bill. The utility controls its feasibility, inspection and meter process; documentation assistance does not guarantee approval.
Consult the DERC regulation directory and the actual utility for current Delhi requirements. A conventional on-grid system stops during an outage and should not be sold as battery backup.
How daytime generation interacts with the grid
Panels generate DC electricity and a grid-tied inverter converts it to AC. Electricity can serve the premises’ loads; an approved connection may export surplus under the applicable metering arrangement.
The balance changes throughout the day with sunlight and consumption. A solar array rating is a power rating, not a promise of daily energy or a zero bill. Fixed charges and consumption outside production hours may remain.
Understand the outage limitation before purchase
A conventional grid-tied inverter shuts down when grid supply fails as part of its protective operation. The array should not be presented as a backup system on its own.
If essential loads must continue during outages, review a compatible hybrid/storage and isolation design. Consider starting demand and required operating time, not only the array capacity.
Prepare the connection and quotation scope
Share electricity bills, sanctioned load, phase and roof details. Confirm the actual utility process for feasibility, installation, inspection and metering before energisation.
Ask the quote to identify panel/inverter models, mounting, wiring, protections, application support and exclusions. Subsidy checks are separate from technical connection approval.
Net-metering process · Home rooftop planning · Compare quotations
Clear answers
Frequently asked questions
What is net metering?
Net metering records electricity imported from the grid and electricity exported by an approved renewable-energy system. Credits and settlement follow applicable rules.
Who approves a net-metering connection?
Your electricity distribution company handles its applicable application, feasibility, inspection and metering process under the relevant regulatory framework.
How can I identify my electricity distribution company?
Check the supplier name and consumer details on your latest electricity bill. Do not infer the supplier only from a locality name.
Can a solar inverter export before approval?
Do not energise or export outside the approved connection process. Follow the utility's requirements and the qualified installer's commissioning instructions.
Is net metering the same as battery backup?
No. Metering concerns grid imports and exports; battery backup stores energy and supplies designated circuits through a compatible system.
Is approval automatic for every roof?
No. Connection capacity, technical feasibility, documentation, safety and the applicable rules must be assessed.
How does sanctioned load affect an application?
It is an input to the utility's assessment. Any capacity or connection changes must follow current rules rather than an assumed universal limit.
Does exported electricity always have the retail value?
No. Export credits and settlement depend on the approved billing arrangement and current regulations. Confirm the treatment before estimating savings.
What is group or virtual net metering?
These are distinct metering arrangements for eligible connections. Availability, allocation and conditions must be checked against current DERC and utility requirements.
Do all Delhi NCR properties follow Delhi rules?
No. Properties outside Delhi may have different utilities, regulators and state processes. Confirm rules for the actual connection address.
What should I prepare before asking for assistance?
Provide the latest bill, connection category, sanctioned load, proposed capacity and roof details. Use the utility's current document checklist.
Where can I check the latest Delhi requirements?
Consult DERC, the Delhi Solar Portal and your electricity distribution company. Requirements and application procedures can change.