ARISE Solar plans commercial rooftop solar for buildings in Delhi, including offices, schools and warehouses. To assess system size and scope, the team reviews daytime loads, roof access and grid connection details. Provide recent bills and building plans to discuss generation assumptions, installation work and an itemised quote.
- Reduced daytime electricity consumption
- Better utilization of available rooftop space
- Scalable system design with energy monitoring
- Operation and maintenance support
Design around the building’s operating pattern
For offices, schools and hospitals, review daytime load and roof access alongside the electricity connection. Schools need safe separation from student areas; hospitals need an independent continuity plan for critical loads. A conventional grid-tied array does not replace emergency power.
Provide bills, roof plans, working hours and shutdown restrictions. Request a project-specific design and commissioning scope, with generation assumptions and charges stated clearly.
Different buildings need different operating plans
Offices and educational buildings
Review working hours, holidays, occupied areas and planned expansion. Schools need safe work segregation and maintained access; offices may need a coordinated electrical shutdown for connection work.
Hospitals and clinics
Assess solar against the normal daytime load, while critical supply remains covered by a separately engineered continuity arrangement. Conventional grid-tied solar must not be treated as emergency backup.
Factories and warehouses
Obtain roof information, structural checks and an installation method suited to operating conditions. Consider fragile sheets, skylights, drainage, fire access and roof warranty responsibilities.
Build the business case using site data
Ask the proposal to state expected generation assumptions, daytime self-consumption and the treatment of exported energy. Use the actual consumer category and billing arrangement. Check fixed charges and other remaining costs before comparing the expected annual cash flow.
Compare the total project scope, maintenance requirements and equipment documentation. Residential central financial assistance should not be assumed for a commercial connection. Procurement and finance teams should review the current applicable terms for their own project.
Agree the commercial handover scope
- Confirm who owns roof permissions, structural review and electrical drawings.
- List engineering, equipment supply, installation, testing and approval responsibilities.
- Agree access, shutdowns, safety controls and acceptance criteria.
- Retain test records, monitoring details, warranties and maintenance responsibilities.
Review the EPC scope or request a business assessment with bills, roof plans and the site location.
Clear answers
Frequently asked questions
What is commercial rooftop solar?
Commercial rooftop solar uses a business or institution's available roof to generate electricity, usually with a design focused on daytime consumption.
Which commercial properties can consider solar?
Offices, schools, hospitals, shops and other institutions can assess solar where roof rights, structural suitability and electrical conditions permit.
How is commercial system size selected?
Review interval or daytime load data, electricity bills, sanctioned load, roof constraints and the permitted connection arrangement before choosing capacity.
Why does daytime consumption matter?
Solar production occurs during daylight. Using generation on site can reduce imports, while exported energy is treated under the applicable billing rules.
Can solar provide emergency power to a hospital?
Conventional grid-tied solar does not replace emergency power. Critical loads need a separately engineered and compliant backup arrangement.
What roof checks are needed for a school?
Check structural suitability, safe access, student separation, fire and maintenance access, shading and permissions before approving the layout.
Are commercial customers eligible for residential CFA?
Residential central financial assistance should not be assumed available to a commercial or industrial connection. Check the applicable official scheme.
How are business savings estimated?
Use the proposed system's generation model, daytime use, billing arrangement, actual tariff and project costs. Savings are site-specific and not guaranteed.
What should an EPC proposal include?
Ask for the layout, equipment schedule, electrical design, work scope, commissioning tests, approval responsibilities and operations handover documents.
Does solar remove the entire electricity bill?
Not necessarily. Consumption outside production hours, fixed charges and billing rules can leave a payable bill.
Can work be planned around business operations?
Discuss roof access, electrical shutdowns, safety controls and operating hours before agreeing to the project programme.
How do I request a commercial assessment?
Share bills, business type, roof plans, location and operating hours. Ask ARISE to confirm site coverage and the feasibility assessment scope.